Generator Site Power Audit

Stacks Image 91
  • Stacks Image 802

    Link
Site Power Audits

We can perform site power audits on your site before a generator is installed or as a review of your current generator operations to find fuel saving measures and other efficiencies.

As the largest cost of running a diesel engine is fuel, using the correct sized generator could save thousands.


Existing Sites

When assessing an existing site, one of our A grade electricians will log data from your equipment, engine loads and fuel consumption to assess where efficiencies can be made.

Upon completion, we'll provide you a formal document containing data on your current power usage, recommendations for improvements and an outline of the results you can expect from these improvements.


Proposed Sites

For proposed installations we will calculate your power requirements by assessing your site plans and and assessing load data of the equipment you plan to operate.

We will provide you with a formal document containing a detailed outline of your power requirements and recommendations on the generator/s size and engine configuration required.
More information:
{"result":"fail", "msg":"Oops! An Error Occurred(001)"}